Since the importance of this project for the capital of Tehran and the planning done by the Tehran Regional Water Company to reach the nominal capacity of 7.5 cubic meters per second for the first module of the treatment plant, till next summer, the meetings of this committee are held continuously.
In this meeting, which was held after the meeting on December 4, 2023 at the site of the treatment plant with the presence of the project members, regarding various issues such as the completion of the land surveying of the location of the Recovery Unit of treatment plant and the requirement of submission the maps of the recovery unit by the end of January 2024 in order to comply with the schedule plan of the implemeting tasks of this unit planned to start from beginning of the fourth week of February 2024 and it was emphasized that according to the schedule of the project engineering department, the works will be carried out by the specialized departments related to the construction of this unit, including process, architecture, structure and geotechnical disciplines and the the project control will be checked the progress of the engineering part on a weekly basis.
In addition, as a matter of fact based on the contract, this unit is expected to manage by the engineering departments in such a way that the change order is not allowed.
The members of the committee are:
Manager of Studies Department: M. Fazeli
Manager of Supervision Department: M.Mohammadi
Manager of legal and contracts Department: S. Eslami
Study project manager: S. Tavana
Supervisory project manager: M. Mousovian
Deputy of studies Department: H.Amini
Head of the Water Treatment Studies Section: F.Siavashi
Head of the estimation Section: H. Abd al-Malki
Project control officer: P. Khandan